Fixings and Fasteners Delivery Across the UK
Professional fixings & fasteners delivery UK-wide. Available 24/7 with GPS tracking.
Birmingham office: +44 121 720 3841 (06:00–17:00) · Evening: +44 7737 778964 (08:00–22:00) · Quotes within 15 min
Fixings & Fasteners Delivery pricing — from £50 (ex VAT)
One fixed price per dedicated job, quoted in full upfront before you book — fuel and goods-in-transit insurance included, no hidden fees. Final price depends on distance, vehicle, urgency and time of day.
| Distance | Miles from collection to delivery |
|---|---|
| Vehicle | Small van for documents/parcels → Luton or 7.5t for pallets & oversized |
| Urgency | Immediate dedicated dispatch vs a planned collection window |
| Time | Out-of-hours, weekends and bank holidays carry a premium |
| Waiting time | Standby at a cargo handler, dock or site |
| Route costs | Dartford Crossing, ULEZ / Clean Air Zone charges |
| Special handling | ADR dangerous goods, temperature control, two-person lift |
| Legs & stops | Return journey or multi-drop routing |
You pay for a dedicated vehicle, not a shared-parcel network rate — so there is no consolidation delay. Call +44 7963 400173 with your collection and delivery postcodes for an instant, all-in quote.
Nothing on a site is cheaper or stops more work than a box of fixings. A crew of four with the right materials and the wrong bolts is four people standing still, and the item they are waiting for costs less than fifteen minutes of their time.
T&C Logistics delivers for fixings and fastener distributors, industrial suppliers and builders merchants into construction sites, fabrication workshops, maintenance teams and trade customers. Companies House records over 600 active UK companies in fixings, fasteners and fastenings. We have run time-critical trade supply since 2020 with more than 3,000 vetted driver-partners nationwide. Quotes from £50 (ex VAT), quoted in full upfront before you book.
Why does a small load fill a van?
Because steel is dense. A box of M12 bolts the size of a shoebox weighs more than a domestic appliance, and a pallet of resin anchors or heavy structural fixings reaches a van's payload while occupying a corner of the floor.
This is the opposite of almost every other delivery this business does, where volume runs out before weight. Quoting a fixings job by box count or by pallet space consistently understates the vehicle, and the correction happens at loading rather than at booking.
| Item | Typical weight | Note |
|---|---|---|
| Box of structural bolts | 20-25 kg | Small box, appliance weight |
| Keg of nails | 15-25 kg | Stacks; loads low |
| Resin anchor cartridges | Boxed, moderate | Some are classified |
| Threaded rod, 1 m lengths | Long, dense | Length decides the vehicle |
| Channel and strut | Long, heavy | Dropside rather than van |
| Fixing pallet, mixed | 400-900 kg | Tail lift or site forklift |
| Site consumables | Bulky, light | Fills the space weight leaves |
| Power tool consumables | Small, high value | Boxed and counted |
See our dropside and tail-lift van pages.
Why are chases so common in this trade?
Because fixings are the last thing anyone specifies and the first thing that runs out. A drawing calls for a bracket; nobody counts the bolts until the brackets are on site.
The commercial shape follows: low-value consignment, high-value consequence, and a customer who needs it now rather than tomorrow. That makes response time the product, exactly as it is in hydraulics and bearings, and for the same reason — the item is stopping labour rather than stock.
Distributors who share their branch network and typical delivery geography in advance get a materially faster answer than those calling cold. Our same-day courier and urgent courier services cover dedicated running.
Are any fixings products classified?
Some are. Resin anchors, chemical fixings, adhesives, aerosols and some cleaning products carry classifications, and they travel in the same order as ordinary steel fixings.
That is the practical risk in this trade: a mixed trade order looks entirely unremarkable and contains two cartridges of chemical anchor. A general courier taking the parcel may be carrying a classified item without knowing, which is a problem for them rather than an abstraction.
Our drivers hold ADR certification, which T&C Logistics holds directly rather than through partners, so a mixed order can be carried correctly rather than split or refused. Declare what is in it. See our hazardous goods service.
Can you deliver onto a construction site?
Yes, and site rules govern. Access is through the main contractor's gate with an induction, a permit and PPE requirements, and the driver reports to a site office rather than a goods-in desk.
The recurring problem is the last part of the journey. A pallet delivered to a site compound may be a long way from the crew waiting for it, and on a large site that gap can be measured in hours. Where a delivery can go direct to a working area, that is worth arranging.
Site hours also start earlier than commercial hours — a crew starting at seven needs the fixings before seven, not in a nine-to-five window. Give us the gate, the induction requirement, and a contact who is on site rather than in an office. See our construction industry hub.
Do you handle scheduled trade replenishment?
Yes, and it is the cheaper half. Branch replenishment, van stock for fitting teams, and scheduled deliveries to workshops and fabricators are all schedulable and cost far less than chases.
The commercial argument is that scheduled movements reduce urgent ones. A fitting team whose van is properly stocked chases less; a workshop with a consumables call-off runs out less. Distributors who set that up spend less overall even though they are paying for more deliveries.
Where a distributor runs both patterns, one arrangement covering routine and urgent produces better pricing on the routine and a faster response on the exceptions. See our manufacturing JIT courier service.
What about long products?
Threaded rod, channel, strut and unistrut change the vehicle entirely. A metre of threaded rod fits a van; three-metre channel does not, and six-metre lengths need a dropside or a flatbed.
Length is also easy to under-report. A trade order described as "fixings and channel" can contain anything from a box of brackets to a bundle of six-metre strut, and the difference is a small van against a flatbed. Give us the longest item rather than the total weight.
Long products also need securing differently: a bundle that shifts in a van is dangerous rather than merely inconvenient, and loose lengths are never carried unsecured. See our flatbed page.
Can you deliver to a workshop or fabricator rather than a site?
Yes, and it is usually the easier delivery. A fabrication workshop has a goods-in door, a forklift and someone expecting the delivery, none of which a site reliably has.
Fabricators also buy differently: larger quantities, planned against a production schedule, with a consumables element that runs on call-off. That makes them schedulable customers rather than chase customers, and worth designing a round around rather than serving individually.
Where a fabricator is working to a site delivery date, the fixings have to arrive early enough to be used rather than early enough to be stored — which is a scheduling conversation rather than a transport one, but it is worth having.
How do you handle counts and part orders?
Against the delivery note at collection and at handover. Fixings orders are frequently made up of many small lines, and a missing line stops the same job as a missing box.
Part orders are common in this trade because distributors ship what they have rather than holding a complete order. That is a commercial decision, but it means a site can receive a delivery and still be unable to work, which is worth knowing before the vehicle leaves rather than after.
Small high-value items — power tool consumables, specialist bits, branded fixings — go missing on busy loads if they are not boxed and counted. They travel boxed rather than loose, and the count is recorded against your reference.
Do you deliver to fabricators working to a site programme?
Yes, and it is the more predictable half of this trade. A fabrication workshop building to a site delivery date knows what it needs and when, which makes the movements schedulable rather than reactive.
The distinction that matters is between fixings for the workshop and fixings that ship with the fabrication. A steel fabricator sending a structure to site usually sends the bolts with it, and those two consignments need to arrive together — a structure on site without its bolts is exactly the stoppage this trade is known for.
Where a fabricator is despatching to a site, delivering the fixings as part of that consignment rather than separately removes the failure. It costs nothing extra and prevents the most common problem in structural steel logistics.
Can you carry stillages and returnable packaging?
Yes, and returnable packaging accumulates fast in this trade. Stillages, kegs, tote boxes and pallets circulate between distributor and customer, and a delivery-only arrangement loses them steadily.
The efficient pattern is the same as every exchange business: full out, empties back, counted at the point of handover. Stillages in particular are expensive and heavy enough that customers do not return them voluntarily.
Where a distributor has stopped tracking returnables because it seemed like a small cost, it is usually worth counting once. The replacement cost of a year's unreturned stillages surprises most businesses that measure it.
Can you collect surplus and returns from site?
Yes, and surplus is worth recovering in this trade because fixings hold their value. A site finishing with three unopened boxes of anchors has real stock sitting in a compound.
The practical obstacle is that nobody owns the job. The site wants the space, the contractor has moved on, and the distributor does not know the surplus exists until a credit is requested months later. A collection booked as the site closes recovers it while somebody is still there to hand it over.
Damaged and opened stock is a different question and belongs to the distributor's own returns policy. What transport contributes is getting it back while it is still identifiable.
What does fixings delivery cost?
One fixed price per job for chases, or a rate per drop on a standing arrangement, quoted upfront with fuel and goods-in-transit insurance included.
| Cost driver | Effect |
|---|---|
| Weight | Dense loads reach payload before space |
| Longest item | Channel and rod decide the vehicle |
| Urgency | Chases are dedicated runs |
| Site access | Inductions, compounds, early starts |
| Classification | Resin anchors and aerosols in a mixed order |
| Drop count | Scheduled circuits cost far less per drop |
| Offload | Tail lift against a site forklift |
| Distance | Dedicated vehicle time both ways |
From £50 (ex VAT). Final price depends on distance, vehicle, urgency and time — quoted in full upfront. Related: electrical wholesaler delivery and technical courier. Call 0121 720 3841 or use our contact page.
Frequently Asked Questions
- Why does a small fixings load need a bigger vehicle?
- Because steel is dense. A box of M12 bolts the size of a shoebox weighs more than a domestic appliance, and a pallet of resin anchors or structural fixings reaches a van's payload while occupying a corner of the floor. This is the opposite of most delivery work, where volume runs out first — quoting by box count or pallet space consistently understates the vehicle.
- Are resin anchors and chemical fixings classified?
- Some are, and that is the practical risk in this trade. A mixed trade order looks unremarkable and contains two cartridges of chemical anchor, so a general courier may be carrying a classified item unknowingly. Our drivers hold ADR certification directly rather than through partners, so a mixed order can be carried correctly rather than split or refused. Declare what is in it.
- How fast can you move a chase?
- Same-day within a region where a vehicle is available. Fixings are the last thing specified and the first to run out — low-value consignment, high-value consequence, and a crew standing still. Distributors who share their branch network and typical delivery geography in advance get a materially faster answer than those calling cold with a postcode.
- Can you deliver directly to a working area on site?
- Where site rules allow, and it is worth arranging. A pallet delivered to a site compound may be a long way from the crew waiting for it, and on a large site that gap runs to hours. Site hours also start earlier than commercial hours — a crew starting at seven needs the fixings before seven, not in a nine-to-five window.
- What information do you need for long products?
- The longest item, not the total weight. A metre of threaded rod fits a van; three-metre channel does not and six-metre strut needs a dropside or flatbed. Trade orders described as 'fixings and channel' can be anything from a box of brackets to a bundle of six-metre lengths — a small van against a flatbed. Long products are also secured differently and never carried loose.
- Do scheduled deliveries actually reduce chases?
- Yes, reliably. A fitting team whose van is properly stocked chases less, and a workshop with a consumables call-off runs out less. Distributors who set up scheduled replenishment spend less overall even though they pay for more deliveries, because the urgent runs they avoid cost several times what a scheduled drop does.
- How are part orders handled?
- Counted against the delivery note at collection and handover, so a site knows what actually arrived. Part orders are common because distributors ship what they hold rather than waiting for a complete order — which means a site can receive a delivery and still be unable to work. Small high-value items travel boxed and counted rather than loose in a busy load.
